''Ca l'Alier'' center

Technical analysis of work costs and feasibility of alternative solutions at lower cost and greater energy efficiency

  • Area
    • 3.000 m2
  • Client
    • Vias y Construcciones. Cobra Instalaciones y Servicios
  • Year
    • 2014
  • Executive budget
    • 13.000.000 €

Preparation of the technical documentation, improvements and methodology required for the companies that decided to submit an offer for this work.

Characteristics:

  • Analysis of all basic project facilities.
  • Definition of an energy management plan according to IPMVP and ISO5001 methodology.
  • Description of an integrated control system and BMS.
  • Simulation of energy consumption for the thermal needs of the building.
  • Simulation of natural lighting.
  • Simulation to determine the affect of the shadows in the building.
  • Simulation of the energy consumption of the building for air conditioning, lighting, etc.
  • Redefinition of the photovoltaic and wind installation in self consumption.
  • Measurement of all NZEB (nearly zero energy balance) measurements.
  • Justification to improve LEED Gold certification to PLATINIUM.