Biomass boiler. Mas Valentí

Technical project for the installation of a 65 kW biomass boiler

Area
  • 300 m2
Energy label
  • A
Power
  • 56 kW (calefacció i ACS)
Client
  • 2sis arquitectura
Year
  • 2014
Phase
  • Execució

Installation of heating and ACS for a rural tourism house. The system works with a biomass boiler combined with a solar thermal system. The project consisted of an energy simulation of the building to know the estimated annual biomass consumption and the implementation of the thermal installations executive project.