Detached house in Begur - nº3

Executive project facilities for a single-family in Begur with with aerothermal and heat recovery.

  • Area
    • 164
  • Energy label
    • A
  • Client
    • Philip Nicholas Hamilton
  • Year
    • 2017
  • Phase
    • Realitzat

Engineering Co2en has developed the entire technical set for the executive project of a residential housing:

  • New Building Energy Certification (A)
  • Executive project and measurements of the following facilities:
    • Air conditioning 
    • Ventilation and sanitation
    • Electrical installations
    • Technical installations
    • Immobile control of the building

Characteristics:

  • Air conditioning with heat recovery for the production of DHW
  • Underfloor heating with fan-coils support