Detached house in Begur

Executive project facilities for a single-family high standing in Begur VRV heat pump, heat recovery for ACS and control system AIRZONE.

0
  • Area
    • 500 m2
  • Energy label
    • A
  • Power
    • 45 kW
  • Client
    • Cobo del arco Estudi d'Arquitectura
  • Year
    • 2014
  • Phase
    • Execució

CO2EN Engineering has developed the whole technical project executive upscale residential housing:

  • Energy Certification new ed.
  • Analysis of different energy options for climate control installations (electricity, diesel or pellet)
  • Project executive and measurements of the following facilities:
    • Air Conditioning (VRV equipment and distribution network with indoor units).
    • Ventilation and sanitation.
    • Electrical installations.
    • Technical facilities (audiovisual and weak signals).
    • Control of the building inmòtic.

Features:

  • Air conditioning by VRV heat recovery to produce hot water.
  • Underfloor support VRV indoor units.
  • Controlled ventilation with heat recovery.
  • Integrated control system AIRZONE.